
Compiled by The Bedford Citizen

A MassDOT project to resurface Rte 4/225 from Rte 128/US 95 to Loomis Street is scheduled from 8 pm to 5 am.
Compiled by The Bedford Citizen
A MassDOT project to resurface Rte 4/225 from Rte 128/US 95 to Loomis Street is scheduled from 8 pm to 5 am.